BLOGGER TEMPLATES AND TWITTER BACKGROUNDS »

Wednesday, April 14, 2010

15th week report

19/04/2010,Monday
Assignment;
Location;
Technician;
Reason; Replacement Holiday (Hari Keputeraan Sultan Perak)

20/04/2010,Tuesday
Assignment;
-solder the components on ICP PCB Board
-assist technician, Cik Siti Hajjar to manage borrowing componet by student in EE Central Store
Location;Technician Room & and EE Central Store
Technician;Pn Siti Hawa and Cik Siti Hajjar

21/o4/2010,Wednesday
Assignment;Learn about on delta and Star connection with practical and theory with En Riyo(GA)
Location;Power Electronic Laboratory
Technician; Pn Suhaili

22/04/2010,Thursday
Assignment;
-assist the technician En Zuraimi and Pn Suhaili to evacuate and arrange;
1. Power Supply
2. Digital Oscilloscope
-learn about on motor notes given by En Zuraimi


Location; Power Electonic Laboratory
Technician; En Zuraimi & Pn Suhaili

23/04/2010,Friday
Assignment;
-assist technician En Zuraimi
1. to evacuate monitor
2. to manage borrowing componets by student in ee centarl store
-doing an experiment AC asynchronous machines no load test on three phase squirrel cage
Objectives; to compute the no-load current and the no-load power factor
Componets;
1. Squirrel cage Asyncronous motor
2. power Supply
3. Cables
4. Cables Support
5. Three phase analyzer
Location;Power Electrical Machine
Technician;En Zuraimi

0 comments: