5/04/2010,Monday
Assignment;
-edit the report draft
-write daily report in blog
Location;Technician Room
Technician;En Musa
6/04/2010,Tuesday
Assignment;
-design the knight rider and power supply schematic circuit and board to put in the report
-edit report draft
1.Power supply.sch
3.Knight Rider.sch Location;Technician room
7/04/2010,Wednesday
Assignment;
-Learn about on WinPicProg PIC Tutorial(LCD Board) according from http://www.winpicprog.co.uk/pic_tutorial_lcd_board.htm
Location;Technician Room
8/04/2010,Thursday
Assignment;
-Learn about on socket and connector function which is suitable to use to power supply project from En Isnani
-Measure each part that want to drill at casing box
Apparatus;
1. power supply PCB
2.Casing box
3. transformer 9v-0-9v
4. ruler
5.paper
6.pencil
Location;PCB laboratory
Technician;En Isnani
9/04/2010,Friday
Assignment;
-edit the draft report
-see how the technician repairing the device and assist him a little bit
Apparatus;Soldering iron,solder lead
Location;Technician room
Technician;En Musa
0 comments:
Post a Comment